May 15
Bids in
37 days
0200-1-0122 Group 3 Mini-Systems Sanitary Sewer Evaluation Study (SSES) Project 9 #17984
(T-NR-E) The CONTRACTOR shall furnish all plant, labor, materials, equipment, and services necessary to perform locating, cleaning, and televising operations of sanitary sewer lines and manholes as required by these Specifications and as illustrated on the Project Drawings. The CONTRACTOR shall perform any associated quality control tests and reports as described herein. It is the intent of these Specifications to provide for the locating, cleaning, and televising materials and procedures to be used in the investigation of the sanitary sewer facilities as shown on the Project Drawings. All equipment, materials, and procedures shall be consistent with these Specifications, current industry standards, and as approved by the ENGINEER. The Work required by the Project shall consist of, but is not necessarily limited to, the following tasks that are to be performed in accordance with these Specifications and CONTRACT DOCUMENTS:
Status
Accepting Bids
Prebid Date | 4/30/25 10:00am |
Bid Date | 5/15/25 3:00pm |
Location
City of Greenville, MS